This web page last updated: 10-Apr-2003  

Cannon AFB, General Plan
October 1998, Revised June 2002

[ Home | Altus | Beale | Buckley | Cannon | Hill | Nellis |Sheppard | Holloman | Luke | Travis ]  


  Download all text Files - GeneralPlan.zip (5.3MB)

TABLE OF CONTENTS

Introduction by the Commander, 27th Fighter Wing

Chapter 1 - Introduction

1.1 Introduction    
  1.1.1 Cannon AFB General Planning Process    
  1.1.2 Cannon AFB General Plan Development    
  1.1.3 Cannon AFB General Plan Content    
1.2 Plan Maintenance, Revision, and Implementation    
  1.2.1 Responsibilities    
  1.2.2 Procedures    
1.3 CycleDevelopment    
1.4 References    

Chapter 2 - Vision

2.1 27th Fighter Wing Vision and Goals    
2.2 Installation Development Vision    
2.3 Development Planning    
  2.3.1 Cannon Air Force Base    
  2.3.2 Local Community    
2.4 Base Development Goals and Objectives    

Chapter 3 - Installation and Vicinity Profiles

3.1 Introduction    
3.2 Installation Profile    
  3.2.1 History    
  3.2.2 Mission, Organization, and Associated Units    
  3.2.3 Population    
  3.2.4 Housing    
  3.2.5 Community Relations    
3.3 Vicinity Profiles    
  3.3.1 Vicinity    
  3.3.2 The Community    

Chapter 4 - Component Plan Overview

4.1 Introduction

Section A Composite Constraints and Opportunities

4.2 Plan Maintenance, Revision, and Implementation    
4.3 Natural, Cultural, and Enviromental Constraints    
  4.3.1 Natural and Cultural Resources    
  4.3.2 Enviromental Quality    
4.4 Operational and Built Constraint    
  4.4.1 Airfield Clearance    
  4.4.2 Explosive Safety Zones    
  4.4.3 Electromagenetic Radiation Safety Zones    
  4.4.4 Antenna Look-Angles    
  4.4.5 Security Clear Zones    
  4.4.6 Noise    
  4.4.7 Off-Installation Constraints    
4.5 Opportunities    
  4.5.1 Off-installation    
  4.5.2 Installation    
4.6 Conclusions and Summary    

Section B Infrastructure

4.7 Introduction    
4.8 Utility Systems    
  4.8.1 Water Systems    
  4.8.2 Sanitary Sewer Systems    
  4.8.3 Storm Drainage System    
  4.8.4 Electrical System    
  4.8.5 Central Heating and Cooling Systems    
  4.8.6 Natural Gas Systems    
  4.8.7 Liquid Fuels Systems    
  4.8.8 Industrial Wastewater Systems    
  4.8.9 Other Utility Systems    
  4.8.10 Utility Systems Summary    
4.9 Communications Systems    
  4.9.1 Information Transfer System    
  4.9.2 Telephone Switching Systems    
  4.9.3 Data Communications    
  4.9.4 Long-Haul Communications    
  4.9.5 Radio Systems    
  4.9.6 Other Systems    
4.10 Fire Protection    

Section C Land Use and Transportation

4.11 Introduction    
4.12 Land Use    
  4.12.1 Installation Considerations    
  4.12.2 Off-Installation Considerations    
4.13 Installation Land Use    
  4.13.1 Airfield and Airfield Pavements    
  4.13.2 Aircraft Operations and Maintenance    
  4.13.3 Industrial    
  4.13 4 Administration    
  4.13.5 Community (Commercial)    
  4.13.6 Community (Service)    
  4.13.7 Medical    
  4.13.8 Housing (Accompanied)    
  4.13.9 Housing (Unaccompanied)    
  4.13.10 Outdoor Recreation    
  4.13.11 Open Space    
  4.13.12 Water    
  4.13.13 Land Use Conclusions    
4.14 Off-Installation Land Use    
  4.14.1 Air Installation Compatable Use Zone (AICUZ) Program    
  4.14.2 Airspace    
4.15 Transportation    
  4.15.1 Local and Regional Network    
  4.15.2 Installation Network    
  4.15.3 Future Transportation Plan    

Section D Capital Improvements Program

4.16 Introduction    
4.17 Facility Development    
  4.17.1 Airfield Pavements    
  4.17.2 Aircraft Operations and Maintenance    
  4.17.3 Industrial    
  4.17.4 Administrative    
  4.17.5 Community (Commercial)    
  4.17.6 Community (Service)    
  4.17.7 Medical    
  4.17.8 Housing (Accompanied)    
  4.17.9 Housing (Unaccompanied)    
  4.17.10 Outdoor Recreation    
  4.17.11 Force Protection    
  4.17.12 Installation Summary    
4.18 Urban Design    
  4.18.1 Architectural Compatibility    
  4.18.2 Landscape Development    
  4.18.3 Area Development Plans    
  4.18.4 Housing Community Plans    
  4.18.5 Quality of Life    

Chapter 5 Plan Findings and Recommendations

4.11 Introduction
4.12 Land Use    


Appendix A - On Base Obstructions To Airfield Criteria
Appendix B - Demolition Plan
Appendix C - References
Appendix D - Acknowledgements
Appendix E - Abbreviations and Acronyms


 [ Home | Altus | Beale | Buckley | Cannon | Hill | Nellis |Sheppard | Holloman | Luke | Travis ]   


This website is powered by Alpine Computer Services...all rights reserved